Skip to content
Scan a barcode
Scan
Paperback Construction Planning & Scheduling Handbook: Practical Methods for WBS, CPM, Baselines, Progress Tracking, Delay Analysis & Recovery Planning Book

ISBN: 1997355019

ISBN13: 9781997355014

Construction Planning & Scheduling Handbook: Practical Methods for WBS, CPM, Baselines, Progress Tracking, Delay Analysis & Recovery Planning

Construction projects succeed or fail based on the quality of their planning.

Master the fundamentals of construction planning and scheduling through practical examples, visual guides and real-world project controls techniques. Learn WBS development, CPM scheduling, float management, progress tracking, delay analysis, recovery planning and executive reporting in a clear and highly visual format.

The Construction Planning & Scheduling Handbook is a practical field guide designed for project managers, planning engineers, project controls professionals, construction managers and engineering students who want to build reliable schedules and make better project decisions.

Using highly visual examples, professional diagrams and real-world construction scenarios, this handbook explains the complete planning process from project initiation through project completion.

Inside this book you will learn:

How to develop a Work Breakdown Structure (WBS)How to define and sequence activitiesHow Critical Path Method (CPM) worksHow to analyze critical and near-critical pathsHow to manage float effectivelyHow to establish and control baselinesHow to measure and update progressHow to prepare lookahead schedulesHow to identify and analyze delaysHow to develop recovery plansHow to accelerate project deliveryHow to create executive schedule reports

This handbook provides practical techniques that can be applied immediately in real-world projects.

Recommended

Format: Paperback

Condition: New

$29.99
Ships within 2-3 days
Save to List

Customer Reviews

0 rating
Copyright © 2026 Thriftbooks.com Terms of Use | Privacy Policy | Do Not Sell/Share My Personal Information | Cookie Notice | Cookie Preferences | Accessibility Statement
ThriftBooks ® and the ThriftBooks ® logo are registered trademarks of Thrift Books Global, LLC
GoDaddy Verified and Secured