Skip to content
Scan a barcode
Scan
Paperback Work Breakdown Structure: Introduction, Design Principles, Terminal Elements, and More Book

ISBN: 1276234929

ISBN13: 9781276234924

Work Breakdown Structure: Introduction, Design Principles, Terminal Elements, and More

No Synopsis Available.

Recommended

Format: Paperback

Temporarily Unavailable

We receive fewer than 1 copy every 6 months.

Save to List

Related Subjects

Engineering Technology

Customer Reviews

0 rating
Copyright © 2026 Thriftbooks.com Terms of Use | Privacy Policy | Do Not Sell/Share My Personal Information | Cookie Notice | Cookie Preferences | Accessibility Statement
ThriftBooks ® and the ThriftBooks ® logo are registered trademarks of Thrift Books Global, LLC
GoDaddy Verified and Secured