Skip to content
Scan a barcode
Scan
Hardcover Very-Large-Scale Integration Physical Design: Engineering Change Order and Timing Design Rule Check Book

ISBN: 1036440532

ISBN13: 9781036440534

Very-Large-Scale Integration Physical Design: Engineering Change Order and Timing Design Rule Check

No Synopsis Available.

Recommended

Format: Hardcover

Condition: New

$132.91
On Backorder
If the item is not restocked at the end of 90 days, we will cancel your backorder and issue you a refund.
Usually restocks within 90 days
Save to List

Related Subjects

Engineering Technology

Customer Reviews

0 rating
Copyright © 2026 Thriftbooks.com Terms of Use | Privacy Policy | Do Not Sell/Share My Personal Information | Cookie Notice | Cookie Preferences | Accessibility Statement
ThriftBooks ® and the ThriftBooks ® logo are registered trademarks of Thrift Books Global, LLC
GoDaddy Verified and Secured