
The objective of this project was to assess the compatibility of small wind turbines ( 100 kW) with Army installations, using Fort Drum, New York, for demonstration. Using one 7.7-kW horizontal-axis wind turbine (HAWT) and one 2.9-kW vertical-axis wind turbine (VAWT), we planned...