Skip to content
Scan a barcode
Scan

All Formats & Editions

1 - 2 of 2 results found
Construction Scheduling, Cost Optimization and ... 0367863804 Book Cover

Construction Scheduling, Cost Optimization and ...

Edition Description

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Edition Details
Format:Paperback
Language:English
ISBN:0367863804
Format: Paperback
Condition:
$
101.99
Construction Scheduling, Cost Optimization and ... 041524417X Book Cover

Construction Scheduling, Cost Optimization and ...

Edition Description

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Edition Details
Format:Hardcover
Language:English
ISBN:041524417X
Format: Hardcover
Condition:
$
310.00
Copyright © 2026 Thriftbooks.com Terms of Use | Privacy Policy | Do Not Sell/Share My Personal Information | Cookie Notice | Cookie Preferences | Accessibility Statement
ThriftBooks ® and the ThriftBooks ® logo are registered trademarks of Thrift Books Global, LLC
GoDaddy Verified and Secured