Skip to content
Scan a barcode
Scan
Paperback Modular Construction for Advanced Manufacturing: Managing Cost and Risk from Factory to Site Book

ISBN: B0HFBPG8CV

ISBN13: 9798192747957

Modular Construction for Advanced Manufacturing: Managing Cost and Risk from Factory to Site

Modules arrive finished. The coordination risk arrives with them.

Modular delivery promises a faster route to a working facility, and on the right project it delivers exactly that. What it does not do is remove coordination risk. It relocates it - into the seam between the factory floor and the site, a handoff that conventional construction protocols were never designed to watch.

That seam is where the expensive failures live. A gasket substituted on the factory floor for sound reasons that nobody thought to report. A design change that reached the site team but never reached the fabricator. A truck journey nobody instrumented. A module that passed every test it was given, and still could not hold dew point once installed.

None of these require an incompetent party or a defective module. Every fabricator delivered a product that passed its own quality checks. The cost accumulated in the handoffs around them.

Written by a chartered quantity surveyor with thirty years across four countries, this is a practitioner's field manual for the cost and coordination gaps that modular delivery introduces into cleanrooms, dry rooms, battery plants, semiconductor fabs, and data centre power and cooling skids.

Inside, you will find: The factory qualification audit - what to ask a fabricator about change discipline before you sign, and what the answers tell youEnvironmental factory acceptance testing - why a passed FAT proves less than it appears to, and what a report must state that it cannot verifyThe factory boundary freeze - the date a design change stops being a drawing revision and becomes a production-line changeTransportation as a construction activity - shock and vibration logging, and the risk transfer point most contracts leave undefinedFour-state staged re-qualification - factory-verified, transport-cleared, site-integrated, environmentally re-qualified, and why skipping to the last one is the costliest shortcut in modular deliveryModule interface registers - the fields a conventional register has no reason to carry, including cumulative tolerance trackingTotal delivered cost - why factory price is a real number and a poor proxy, and what routinely sits between the twoPermitting a building that does not yet exist in the jurisdiction's eyes - statutory super load lead times and the authority that has never reviewed a module

Three composite case studies - a battery dry room, semiconductor cleanroom pods, and data centre power and cooling skids - trace nine coordination failures from cause to invoice, with the cost and schedule consequences reconciled in full.

Includes a complete field guide appendix: audit checklists, contract clause language, a receiving readiness checklist, the four-state gating framework, and a failure-mode quick reference you can take onto a live project.

For quantity surveyors, cost managers, project controls professionals, commissioning agents, owner's representatives, and anyone accountable for a facility that arrives on a truck.

Part of the Cost Management Professional Series.

Recommended

Format: Paperback

Condition: New

$19.99
Ships within 2-3 days
Save to List

Customer Reviews

0 rating
Copyright © 2026 Thriftbooks.com Terms of Use | Privacy Policy | Do Not Sell/Share My Personal Information | Cookie Notice | Cookie Preferences | Accessibility Statement
ThriftBooks ® and the ThriftBooks ® logo are registered trademarks of Thrift Books Global, LLC
GoDaddy Verified and Secured