Summarizing the results of an inventory and evaluation of pertinent projects from initial design through construction and operation, this title is the result of a survey of the engineering community involved in dam safety modifications. In the area of spillway design, emphasis is placed on the usage of labyrinth spillways and fuseplug embankments.